Documents:
The documents below show the five corridor maps that were used during the August 10, 2006 Public Workshop.
In the workshop, each group was also given a base map (PDF - 247KB) of the entire study area to provide context.
The maps below show the roadway, bicycle, pedestrian, and transit connections proposed at the September 18, 2006 Public Workshop.
This document (PDF - 476KB) is a conceptual representation of the traffic flow and safety improvements proposed for Kōloa Town. Proposed improvements include parking changes, an intersection realignment, stop and yield sign changes, and street conversions (to one-way).
This executive summary (PDF - 1.2MB) outlines the plan’s major objectives, community engagement process, stakeholder partnerships, major recommendations for each mode, project costs and funding sources, and implementation strategy.
This handout (PDF - 103KB) was distributed at the January 10, 2007 County Council Meeting to provide a brief summary
of the planning process, project objectives, community relationships, plan recommendations, and proposed funding sources.
|